Crow Wing County

Welcome, Guest!
Log in | Sign up
 

Info

To see any actions specific to your user account, please log in.

Font Size:
Entrance Permit Application
Permit # ENT 2016-0022
App. # 2016-0349

UID # 19506
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.
  • I have read the Entrance Access Policy in section 4.

Invoice 06/14/2016

Charge Cost Quantity Total
Non-Taxable
added 06/14/2016 5:20 PM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total (Paid) $500.00
Action: Print  

Invoice 06/24/2016

Charge Cost Quantity Total
Non-Taxable
added 06/24/2016 7:45 AM

6" x 20' culvert

$64.18 x 1 $64.18
added 06/24/2016 7:45 AM

Inspection Fee

$25.00 x 1 $25.00
added 06/24/2016 7:45 AM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total (Paid) $-410.82
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantDave J. Dauer - 06/14/2016 5:20 PM
b84e8921f903b068c718189fb3a04e11
476931bb57126d23658790f0504f8d59
 
#1 Administrative ReviewCindy Rader - 06/20/2016 2:01 PM
765152d08737cb2dcd56e8d563b1cb92
7b89359153a67fbfab53563ba48f4a2d
 
#2 Preliminary Site InspectionJory Danielson - 06/23/2016 4:27 PM
d6a6eab8415e6863dafb0a6f2f5e936d
ce795519322a47fd5e1d9ccedc3debcf
 
#3 Final InspectionCindy Rader - 08/24/2016 2:29 PM
763e732ab52fe3863eeed61e0a31a100
6ac7a78fbf784967929733af7464a52f
 
#4 Final Inspection ReportJory Danielson - 09/30/2016 10:51 AM
227e3206f805d89c04288845cef3a663
ad8c4a28419a39a5b3eb8e6e3221840b
 
Application has been approved. All signatures have been obtained.

Notes

06/15/16 Fee has not been paid, not marked will pay by check. Will recheck for payment 6/20/16. ckr
06/20/06 Fee paid, to maintenance for review. ckr
6-23-16 Met with Dave onsite to discuss the approach. The approach will be for lot 590181308B00009 and must be installed next to the address sign and then north. A 6" x 20' culvert will be needed. Dave or Jerry Hutchison will call when he is ready for the culvert. JD
9-26-16 Site inspection. Culvert repaired. OK to release. JD
8-24-16 inspected the approach. Culvert ends are smashed and there is a washout on the south side. Grass is just starting to grow. Not substantial vegetation and culvert needs to be repaired. JD
8-1-16 The new approach at 22655 Cr. 10, which has a 6 inch culvert, the ends are smashed already. As of right now I don't think we could cut the ends off. LM
Drove by and observed the approach was put in 20' north of where we said it should go. Spoke to Dave and said we would review and get back to him.
06.23.16 refund will be $410.82, journal entry requested. ckr
6-28-16 Called and is ready for culvert. JD