Crow Wing County

Welcome, Guest!
Log in | Sign up
 
Font Size:
Entrance Permit Application
Permit # ENT 2016-0030
App. # 2016-0394

UID # 21032

Current Status: Site Approved
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 08/12/2016

Charge Cost Quantity Total
Non-Taxable
added 08/12/2016 3:20 PM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 08/12/2016$500.00
Due$0.00

Invoice 08/30/2016

Charge Cost Quantity Total
Non-Taxable
added 08/30/2016 8:38 AM

18" apron

$45.74 x 2 $91.48
added 08/30/2016 8:38 AM

18" band

$9.17 x 2 $18.34
added 08/30/2016 8:38 AM

18" X 12' culvert

$85.81 x 1 $85.81
added 08/30/2016 8:38 AM

18" x 16' culvert

$110.67 x 2 $221.34
added 08/30/2016 8:38 AM

Inspection Fee

$25.00 x 1 $25.00
added 08/30/2016 8:38 AM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total $-58.03
Due$-58.03

Approvals

ApprovalSignature
ApplicantJASON M. WING - 08/12/2016 3:20 PM
d7cf93fa41602792c442dcf8941e748d
ab3f54cac295517849f73cdf047b4edc
#1 Administrative ReviewCindy Rader - 08/12/2016 3:52 PM
f9b37c3c8133ccbebc50e489b9569b56
bf7a30d398188fccc3f2cb15780b0a1b
#2 Preliminary Site InspectionJory Danielson - 08/25/2016 7:45 AM
f83c1265e04e8f84304a3fda6d743e7a
e9405e6b640549b7f492c05358a6b9b9
#3 Final Inspection Completed 
Application will be approved after the above signatures are obtained.

Public Notes

Text:
08/12/16  fee paid, to maintenance for review. ckr
8-17-16 performed site inspection.  Called Jason to verify location since no stake of marking present. Waiting for response. JD
8-23-16 spoke to Jason.  He wants to stay away from the minimum maintenance road an go at least 300' south of it.  He will mark it and call me when it is marked. JD
8-25-16 Inspected.  Will require a 18"x44' (2 -16' & 1 - 12') w/ 2 bands and 2 aprons. JD

8-2-17 left message notifying Jason it needs to be completed with topsoil and seed.  He is coming up on a year and will forfeit the deposit if he does not complete it. JD
08/30/16  costs determined, refund will be $58.03.  Journal entry to finance.  ckr
8-30-16 pipe delivered. JD
File(s):

    Internal Notes