Crow Wing County

Welcome, Guest!
Log in | Sign up
 

Info

To see any actions specific to your user account, please log in.

Font Size:
Entrance Permit Application
Permit # ENT 2017-0008
App. # 2017-0476

UID # 26097
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.
  • I have read the Entrance Access Policy in section 4.

Invoice 03/24/2017

Charge Cost Quantity Total
Non-Taxable
added 03/24/2017 2:49 PM

Commercial Entrance Deposit

$750.00 x 1 $750.00
Grand Total
Total (Paid) $750.00
Action: Print  

Invoice 03/31/2017

Charge Cost Quantity Total
Non-Taxable
added 03/31/2017 1:42 PM

Commercial Entrance Deposit

$-750.00 x 1 $-750.00
added 03/31/2017 1:42 PM

Inspection Fee

$25.00 x 1 $25.00
Grand Total
Total (Paid) $-725.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRODNEY S. PARROTT - 03/24/2017 2:49 PM
3284cac0fa34a03f7fed95d2073e5ae7
e49e9eb1d46d31643cd03f5653e38a2f
 
#1 Administrative ReviewCindy Rader - 03/27/2017 8:53 AM
deae034311fe5bf4fbbcee009be368ab
adffdebfa387fb2f078c26b0474de7f8
 
#2 Preliminary Site InspectionJory Danielson - 03/31/2017 1:15 PM
c2e7793b62bb5fac2336a0909e4755fa
6264524b21c9303ae1ea35a743075cc3
 
#3 Final Inspection RequestJory Danielson - 10/02/2017 1:46 PM
2fe49cbcdb14d069d31ca984f9a94fb0
8bdb1060407cf978d9f0c5506f5769c1
 
#4 Final Inspection CompletedJory Danielson - 10/02/2017 1:46 PM
525048ac995156153de05e776b6d1f1b
1e330c3b1520c01ef3af6c3f4e123459
 
Application has been approved. All signatures have been obtained.

Notes

03.27.17 fee paid to maintenance for review. ckr
Set up a meeting onsite with Bill for April 4th @ 1pm. JD Site will have contractor supplied concrete pipe.
03/21/17 no materials needed, refund will be $725 upon completion of final inspection. ckr
3-31-17 Met with Matt Borden onsite. Spoke to John on the phone. Potential issue with MNDOT RWICS vaults. John believes the radiuses are outside the vaults. Rob is checking with MNDOT. Gave OK to proceed with the understanding the vaults could cause an issue and the approach must be put in as per the plan to keep it away from the CR 3 turn lane.
8-2-17 Inspected ok. Still needs a white line removed for the bypass lane per Rob, before we can release. JD
10-2-17 Ok to release. JD
10/02/17 refund request submitted. ckr
10/12/17 refund ck #12082 mailed, application filed. ckr