Crow Wing County

Welcome, Guest!
Log in | Sign up
 

Info

To see any actions specific to your user account, please log in.

Font Size:
Entrance Permit Application
Permit # ENT 2017-0011
App. # 2017-0499

UID # 26618
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.
  • I have read the Entrance Access Policy in section 4.

Invoice 04/18/2017

Charge Cost Quantity Total
Non-Taxable
added 04/18/2017 5:10 PM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total (Paid) $500.00

Invoice 05/09/2017

Charge Cost Quantity Total
Non-Taxable
added 05/09/2017 3:37 PM

6" x 10' culvert

$33.98 x 1 $33.98
added 05/09/2017 3:37 PM

6" x 20' culvert

$64.19 x 1 $64.19
added 05/09/2017 3:37 PM

Inspection Fee

$25.00 x 1 $25.00
added 05/09/2017 3:37 PM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total (Unpaid) $-376.83

Approvals

ApprovalSignature
ApplicantMatthew J. Gallaway - 04/18/2017 5:10 PM
1be24ccbab430f34cfcdad44035c808e
4850673ccf57844c90271b277f207dd8
#1 Administrative ReviewCindy Rader - 04/19/2017 12:36 PM
6f74915348a3256c8d1607d041983957
bc4e45626c82e86e2365cf5f57cfca8b
#2 Preliminary Site InspectionJory Danielson - 05/09/2017 3:13 PM
5168ce13b19e9750b38672be04352214
05532a409004cda39aa8428717a39242
#3 Final Inspection Request 
#4 Final Inspection Completed 
Application will be approved after the above signatures are obtained.

Notes

04/19/17 Fee paid. To maintenance for review. ckr

4-18-17Spoke with Matt on the phone. he is waiting for a survey and then will decide on the location of the approach. There appears to be approaches on the property currently that he said he will remove when he puts a new approach in. JD

05/09/17 costs determined, refund after final inspection will be $376.83. ckr

4-8-17. Inspected and saw survey stakes for the driveway. Spoke to Matt on the phone and he said he will only have a 20' wide approach. The existing approach will be removed and used for fill on the new approach. The approach will require 6" x 30' with 1 band. JD