Crow Wing County

Welcome, Guest!
Log in | Sign up
 
Font Size:
Entrance Permit Application
Permit # ENT 2017-0012
App. # 2017-0504

UID # 26963

Current Status: Filed
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 04/30/2017

Charge Cost Quantity Total
Non-Taxable
added 05/01/2017 10:12 AM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 05/01/2017$500.00
Due$0.00
Action: Print  

Invoice 05/03/2017

Charge Cost Quantity Total
Non-Taxable
added 05/03/2017 1:50 PM

6" x 10' culvert

$33.98 x 1 $33.98
added 05/03/2017 1:50 PM

6" x 20' culvert

$64.19 x 1 $64.19
added 05/03/2017 1:57 PM

Inspection Fee

$25.00 x 1 $25.00
added 05/03/2017 1:57 PM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total $-376.83
Due$-376.83
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJeffrey E. Austin - 05/01/2017 10:16 AM
2b77e94ece6cccfec3a7b9c62e1bef85
7f3fd4ce34d48ff8878e4f94c9105912
 
#1 Administrative ReviewCindy Rader - 05/01/2017 10:28 AM
70808d8713a6239299e58b175b6f0ad2
48fb818a84319a8b87c45c3edd6d09ea
 
#2 Preliminary Site InspectionJory Danielson - 05/03/2017 12:20 PM
121ab671c6aa35bfe9675132a39644b9
a22521acd0990df146c14ef5f4d0ad62
 
#4 Final Inspection CompletedJory Danielson - 10/13/2017 3:26 PM
63f1b873edbbc9ac24546ef54515a1f5
330239623c338db2a2fcf39e6eeffff0
 
#3 Final Inspection RequestJory Danielson - 10/13/2017 3:26 PM
4f6a55ce5f259d93d776ed41e0d68373
0a1ddf9ea237a3460ba15c03acc8d0f5
 
Application has been approved. All signatures have been obtained.
Text:
05/01/17  fee paid, to maintenance for review.  ckr
5-1-17 Spoke to Jeff.  He plans to install driveway later this summer and finish the lot in the summer of 2018.  I said that would be acceptable. JD
5-2, inspected the site.  Will require a 6" x 30' culvert. JD
05/03/17  material costs determined, refund will be $376.83.  ckr
Spoke to Jeff 5-4-17.  Will deliver pipe 5-8-17. Delivered pipe 5-8-17. JD
Spoke to Jeff 5-4-17.  Will deliver pipe 5-8-17. JD
10-12-17 inspected and ok to release. JD
10.13.17 refund check requested.  ckr
10.26.17 refund ck #12244 mailed.  ckr
File(s):