Crow Wing County

Welcome, Guest!
Log in | Sign up
 
Font Size:
Entrance Permit Application
Permit # ENT 2017-0027
App. # 2017-0541

UID # 28346

Current Status: Work Completed/Filed

Valid: 06/20/2017 - 06/20/2018
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 06/16/2017

Charge Cost Quantity Total
Non-Taxable
added 06/20/2017 2:27 PM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 06/20/2017$500.00
Due$0.00
Action: Print  

Invoice 06/21/2017

Charge Cost Quantity Total
Non-Taxable
added 06/21/2017 4:16 PM

18" apron

$45.74 x 2 $91.48
added 06/21/2017 4:16 PM

18" band

$9.17 x 2 $18.34
added 06/21/2017 4:16 PM

18" X 12' culvert

$85.81 x 3 $257.43
added 06/21/2017 4:16 PM

Inspection Fee

$25.00 x 1 $25.00
added 06/21/2017 4:16 PM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total $-107.75
Payment 08/16/2017$-107.75
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantHeidi Kraklau - 06/20/2017 2:29 PM
e6e052e436bc5d7676b4173481c6835a
22c63d46efb0f24edfd702bd425cb529
 
#1 Administrative ReviewCindy Rader - 06/20/2017 2:58 PM
5bc7ad50c5feaa1054ebdf5cd012e4d2
4eb109c9cef97ebe99473786fe286b1d
 
#2 Preliminary Site InspectionJory Danielson - 06/21/2017 2:16 PM
b9e89d6af2c31c18e95e6378ad19f2d2
8697abdc21b87502c7dde28129da3a36
 
#4 Final Inspection CompletedJory Danielson - 08/02/2017 8:45 AM
69f245121da0e4d579740f44aaade09b
b7027392b828ceae6fddf3a28cc147ba
 
#3 Final Inspection RequestedJory Danielson - 08/02/2017 8:45 AM
dedf7fa27919efc1156e5203a25d0c37
5f1cdb6c9a2145df4ac24cae37a74515
 
Application has been approved. All signatures have been obtained.
Text:
06.20.17  Deposit paid, to maintenance for review.  ckr
6-20-17 Inspected.  There is an approach on the west end of the lot.  I told Heidi they have the option to move it across from their driveway.  They have a unique situation where there is overlap between them and their west neighbor.  I found a pin on the west side of the opening so it appears the approach is completely on their property. Heidi asked to put the approach on hold and said she will talk to her husband and get back to me. JD

8-2-17 Inspected and ok to release. JD
6-29-17 Culvert delivered. JD
6-21-17 Heidi called back and said they do want to remove the existing approach and move it east across from 21780.  She wants a new culvert 18" x 36' (3 -12') with 2 bands and 2 aprons.  She will call with a delivery date. JD
06/21/17  costs determined, refund will be $107.75 after final inspection.  ckr
08/03/17 refund requested.  ckr
08/16/17 refund ck #11503 mailed.  ckr
File(s):