Crow Wing County

Welcome, Guest!
Log in | Sign up
 
Font Size:
Entrance Permit Application
Permit # ENT 2018-0027
App. # 2018-0698

UID # 32769

Current Status: Work Completed/Filed

Valid: 06/11/2018 - 06/11/2019
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 01/30/2018

Charge Cost Quantity Total
Non-Taxable
added 06/11/2018 6:15 PM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 06/14/2018$500.00
Due$0.00
Action: Print  

Invoice 07/11/2018

Charge Cost Quantity Total
Non-Taxable
added 07/11/2018 9:20 AM

12" apron

$26.43 x 2 $52.86
added 07/11/2018 9:20 AM

12" band

$4.91 x 2 $9.82
added 07/11/2018 9:20 AM

12" x 12' culvert

$56.18 x 3 $168.54
added 07/11/2018 9:20 AM

Inspection Fee

$25.00 x 1 $25.00
added 07/11/2018 9:20 AM

Residential Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total $-243.78
Payment 10/04/2018$-243.78
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicantwayne j. stock - 06/11/2018 6:16 PM
bffc66429e05501d3cdd0f8f8c9a6c12
6d6da5509c570f591469cc4cca73924d
 
#1 Reviewed by AdminCindy Rader - 06/14/2018 2:42 PM
25516e937cfbe7c9d43ce71fc547b457
2b28b2b9ad561f8628aca7e4cf090251
 
#2 Preliminary Site Inspection CompletedJory Danielson - 06/21/2018 12:58 PM
3a54134179bc94b1306108a239c99fd1
a64d04224f6ecbeb30f690f386312445
 
#3 Final Inspection CompletedJory Danielson - 10/03/2018 3:48 PM
57a46800fb51e08fb663670bd21cfdde
eebdd02068897677aca3be228d817085
 
Application has been approved. All signatures have been obtained.
Text:
06.12.18 holding until deposit check received.  ckr
06.14.18 check received.  ckr
6-19-18 inspected. Will require a 12"x36' (3-12') culverts 2 bands and 2 aprons. JD
06.21.18 refund will be $243.78 after final inspection.  ckr
08/15/18 called ready for culverts to be delivered to be delivered 8/16/18.  ckr
08/27/18  called ready for final inspection.  ckr
9-6-18 inspected.  East slope needs tobe graded to a 4:1 and vegetation needs to be established.  Called and left a message for Wayne. JD
10-2-18 Ok to release deposit. JD
10/04/18 request for refund sent to finance.  ckr
File(s):