01. Environmental Services 07. Conditional Use Permit Application (CUP) Permit # 2306286, App. # 22392, UID # 69221
App. Status: Approved
Crow Wing County
322 Laurel St. Ste 15
Brainerd, MN 56401
 

Applicant & Property Information

:
Are you the property owner? No
Contact information:
Name:
Hemphill
Phone:
(918834 - 2200
Email Address:
scott.tinker@hemphill.com
Mailing Address:
1305 North Louisville Ave
Tulsa OK 74103

Authorized Agent Information

Please enter the authorized agent's contact info:
Name:
Rick Adams
Phone:
(218839 - 4800
Email Address:
rickad@tds.net
Mailing Address:
1635 E Ponto Lake Rd NW
Backus MN 56435 5643
Please sign and attach the Authorized Agent Form:

Required Information

Please provide info about your existing septic system: There is no septic system on this property
Did you attend a Development Review Team (DRT) meeting? Yes
How is the site accessed? Public Road

Project Specifics

Is survey already on file with Crow Wing County? No
Please select the type of project: Cell Tower
Please attach survey:
Please explain your request:
To build a new wireless communication facility to include a 199' Monopole type tower, associated antennas, and associated ground equipment
Do you need an E911 address for this site? Yes

CUP Findings of Fact

1. What impact will the proposed use have on the health,
safety, and general welfare of the occupants in the
surrounding neighborhood?
Increased wireless availability should increase the safety and security of the neighborhood that it services.
2. Is the proposed use able to meet with the standards of
the County Land Use Ordinance? Why?
Yes, meets all general design standards in Crow Wing County's zoning ordinance
3. Is the proposed use consistent with the goals and
policies adopted within the County's Comprehensive
Plan? Why?
Yes, the comprehensive plan allows for deployment of wireless services if they meet the general standards in the zoning ordinance.
4. Will the proposal cause any adverse effect on property
values and future development of the land in the
surrounding neighborhood? Why?
No, surveys have shown that having adequate high spped wireless services available to a neighborhood is desirable by the general population and is an important factor when homeowners are looking to purchase property.
5. Will the proposed use have an effect on public utility,
public services, road and schools? Why?
No, site to be unmanned and will generate approx. 4 maintenance visits per year per carrier.
6. Will the proposed use have an impact on the
environment including its impact on groundwater, surface
water and air quality? Why?
No, site will disturb very little ground area and requires no water or septic system.  Also, will not have any emissions that would affect air quality.
7. Does the proposed use have adequate water supply,
subsurface sewage treatment system facilities, erosion
control and stormwater management pursuant to
applicable standards? Why?
Yes, no water or septic services required.  Site is very flat and will not create any surface water drainage issues

Terms

Terms & Conditions
    1. Approval or denial of applications is determined by the Planning Commission/Board of Adjustment or the County Board of Commissioners at a Public Hearing meeting per Minnesota Statute 394 and the Crow Wing County Land Use Ordinance.
    2. Land Use Permits and Individual Sewage Treatment System Permits are valid for two (2) years unless Septic Permit is to upgrade your systems, which is then valid for ten (10) months.
    3. All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Crow Wing County.
    4. It shall be a violation of the Crow Wing County Land Use Ordinance to commence construction before the application is approved by the Planning Commission/Board of Adjustment.
    5. The property owner or authorized agent may make application for a variance, conditional use permit, land use map amendment or plat agreeing to do such work in accordance with all Crow Wing County Ordinances. The property owner or authorized agent agrees that the application, certificate of survey and other attachments submitted herewith and which are approved by Crow Wing County are true and accurate. The property owner or authorized agent agrees that, in making the application for a variance, conditional use permit, land use map amendment or plat, the property owner grants permission to Crow Wing County, at reasonable times, to enter the property to determine compliance of the application with applicable ordinances and/or statutes. It is the property owners sole responsibility to contact other localities to ensure compliance with all relevant local, county or State law.
    6. After a complete application is submitted, an on-site inspection may be conducted, and the application is reviewed. Changes to a project may require the application to be tabled at the Public Hearing.
    7. The septic installer shall notify the Crow Wing County contracted inspector, Greg Kossan 218-839-2206, a minimum of twenty-four (24) hours before covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
    8. Septic systems deemed to be failing by a qualified inspector need to be upgraded within ten (10) months. Septic systems that are deemed a risk to public health shall be upgraded and/or replaced as soon as possible.
    9. Permits for a new septic system or for upgrades associate with an addition are valid for only two (2) years.
    10. Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
    11. Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
    12. Applicants acknowledge that they are in compliance with MN Statute 326.121 subd. 1 which states: The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code.
    13. If you are doing excavation work, we are required to notify you of Minnesota Statute sections 216D.03 to 216.07.

Invoice #41324 (12/10/2024)

Charge Cost Quantity Total
Non-Taxable
added 12/10/2024 9:14 AM

$800.00 x 1 $800.00
added 12/10/2024 9:14 AM

$46.00 x 1 $46.00
Grand Total
Total $846.00
Payment 12/10/2024$846.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRichard Adams - 12/10/2024 9:15 AM
5a69a30ce8f277460a306e47b15c5ae2
4cc261197e772a51529f07403e89bcc3
 
#1 Environmental Services Staff (Reviewed)Nicole Hausmann - 12/12/2024 9:16 AM
9ddf0f6f65d2a8465f93c4877cb66126
327f30daa89b53f8037d01579883aa2c
 
#2 Board ApprovalNicole Hausmann - 01/22/2025 11:25 AM
ccc01a40dd00f51266b75c7167ec76c4
94c8fe54d8d61b1a321084b090cdbaa9
 
Application has been approved. All signatures have been obtained.
Text:
01/22/2025 - CUP approved by Planning Commission with conditions. NLH
File(s):
    Powered by