Crow Wing County

Welcome, Guest!
Log in | Sign up
 
Font Size:
Entrance Permit Application
Permit # ENT 2015-0007
App. # 2015-0148

UID # 9119

Current Status: Site Approved

Valid: 04/22/2015 - 04/21/2016
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 04/22/2015

Charge Cost Quantity Total
Non-Taxable
added 04/22/2015 3:20 PM

Commercial Entrance Deposit

$750.00 x 1 $750.00
Grand Total
Total $750.00
Payment 04/22/2015$750.00
Due$0.00

Invoice 05/19/2015

Charge Cost Quantity Total
Non-Taxable
added 05/19/2015 7:51 AM

24" band

$9.23 x 2 $18.46
added 05/19/2015 7:51 AM

24" x 12' culvert

$110.88 x 2 $221.76
added 05/19/2015 7:51 AM

24" x 16' culvert

$158.56 x 1 $158.56
added 05/19/2015 7:51 AM

Commercial Entrance Deposit

$-750.00 x 1 $-750.00
added 05/19/2015 7:51 AM

Inspection Fee

$25.00 x 1 $25.00
Grand Total
Total $-326.22
Due$-326.22

Invoice 05/19/2015

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00

Approvals

ApprovalSignature
ApplicantSarah Barrett - 04/22/2015 3:20 PM
c2a1782eafa543c057bf35c1dd87d904
1eefcb4c41df3ce871f28d389bc98e28
#1 Administrative ReviewCindy Rader - 04/22/2015 3:47 PM
4afb1f8f543deeee25b8fc637f0b817b
127885a18c8dd85d748219d9c3a94112
#2 Preliminary Site InspectionCindy Rader - 05/19/2015 7:29 AM
c4a8913eada5cb085d018c4f1b3317fc
da12a1d70d0e8da69eab3e4769e0e720
#3 Final Inspection Completed 
Application will be approved after the above signatures are obtained.

Public Notes

Text:
04/22/15  to engineer for review.  ckr
05/01/15  call from applicant, says south driveway will be temporary for logging, then to be removed.  Please call her to discuss, logger wants to start moving as soon as road restrictions are lifted.  CKR
5/19/15  Approved to move driveway entrance and temporary logging entrance. New driveway entrance will need a 24" pipe. 2 12 foot  by 24" and 1 16 foot by 24" for a total of 40 feet. 2 24" bands needed. Temporary logging entrance will be put in when logger is ready to come and will have a removal date set when notified when they will begin  logging. The north entrance (field entrance) has not been approved until further notice. LBM
File(s):

    Internal Notes