Entrance Permit Application
Permit # ENT 2016-0041
App. # 2016-0457

UID # 23380

Current Status: Site Approved

Valid: 11/21/2016 - 11/21/2017
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110 Fax (218) 824-1111
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice 11/21/2016

Charge Cost Quantity Total
Non-Taxable
added 11/21/2016 11:28 AM

Residential Entrance Deposits

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 11/21/2016$500.00
Due$0.00
Action: Print  

Invoice 04/24/2018

Charge Cost Quantity Total
Non-Taxable
added 04/24/2018 4:21 PM

Inspection Fee

$25.00 x 1 $25.00
added 04/24/2018 4:21 PM

Temporary Entrance Deposits

$-500.00 x 1 $-500.00
Grand Total
Total $-475.00
Due$-475.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicanted patrias - 11/21/2016 11:28 AM
5e8261ce7db46b65f8f2262d70cf762c
62ee3293998e699667ecd158242076f2
 
#1 Administrative ReviewCindy Rader - 11/21/2016 2:02 PM
5dae11ec001bd47243c07510a4b0c90d
960c8ff6fa23e191c13be30a5dd789fe
 
#2 Preliminary Site InspectionJory Danielson - 12/12/2016 5:59 AM
7f68ed3a2243c406c7b0bf1a3eedc330
82e9d79b84f4cc9fdd7365b5e9f76ee0
 
#3 Final Inspection Completed 
You do not have the necessary rights for this signature
Application will be approved after the above signatures are obtained.
Text:
11/21/16  fee paid, there are 2 parcels on CSAH 29  290343103A00009 and 290343300A00009.  To maintenance for review.  ckr
12-1-16 Inspected.  Need to determine approach location.  Both parcels connect to lesser traveled roads but with this being a logging operation we don't want to push truck traffic onto these roads if the approach is temporary.  Call into Ed to determine temporary and location. JD
12/7/16 Ed and I met onsite.  We determined the approach can't be off of 9th Ave due to the wetland pond and creek.  It will go just east of the highline pole on the straight stretch of CR 29 just east of the middle of the parcel. A culvert will be needed but the size won't be determined until next summer when Ed cuts down the back slope bank. JD