04. Highway Department Entrance Permit Application Permit # ENT 2017-0009, App. # 2017-0480, UID # 26224
App. Status: Work Completed/Filed
Valid: 03/31/2017 - 03/31/2018
Highway Department
16589 County Road 142
Brainerd, MN 56401
Phone: (218) 824-1110
email: highwayinfo@crowwing.us
 

Terms

Entrance Terms and Conditions
  • I have reviewed the Cross-Section diagram in section 3.

  • I have read the Entrance Access Policy in section 4.

Invoice #15171 (03/31/2017)

Charge Cost Quantity Total
Non-Taxable
added 03/31/2017 9:54 AM

Residential Entrance Permit Fee

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 03/31/2017$500.00
Due$0.00

Invoice #15352 (04/18/2017)

Charge Cost Quantity Total
Non-Taxable
added 04/18/2017 8:01 AM

Inspection Fee

$25.00 x 1 $25.00
added 04/18/2017 8:01 AM

Residential Entrance Permit Fee

$-500.00 x 1 $-500.00
Grand Total
Total $-475.00
Payment 06/05/2019$-475.00
Due$0.00

Approvals

ApprovalSignature
ApplicantDavid R. Lindbom - 03/31/2017 9:54 AM
e0a7a7cdd1473e5aa526444b749898e3
3dba722f22b8e85e954e52c2b42f2c01
#1 Administrative ReviewCindy Rader - 03/31/2017 1:52 PM
8f9871420e2dc9fb4e69e99ca5e30743
c4f981226a735cdbe08da1502f9abcfc
#2 Preliminary Site InspectionJory Danielson - 04/17/2017 4:48 PM
9452994920ca750adc7edfb041486569
3139e1d793c044b5d6c186370696cab9
#3 Final Inspection CompletedJory Danielson - 06/05/2019 12:11 PM
62c6e89b750c5f3e0f17e76f950bc367
036ab9cd30c9aa46d89dad8b51604e15
Application has been approved. All signatures have been obtained.

Public Notes

Text:
03/31/17  Applicant was unable to pay on-line, so will be mailed a check today.  Told him need check prior to delivering materials.  To maintenance for review.  ckr
03/31/17  Applicant brought check into office.  Also revised width of driveway from 20' to 8'.  ckr
3-31-17 David stopped into the office to discuss his plan.
4-10-17 Looked onsite.  Will allow an entrance on the south lot on the south side of the lot.  Will require the south approach be removed before we would allow an approach on the middle lot.  David said he is removing a structure on the middle lot and then will remove the approaches on the north lot. No culvert is needed. JD

4-3-17 Inspected onsite.  Spoke with David on the phone 4-3-17 JD

04/18/17  no culvert materials needed, refund will be $475.00  ckr
5-28-19 met with David on site. He still needs to remove the approach. He said he will and play Sade so the driveway is conforming. JD
5-31-19 David removed one of the approaches and paced sod.  Inspected on 6-3-19 and OK to release. JD
06/05/19 refund request to finance.  ckr